loading

One-stop LED Lighting Solutions Manufacturer Since 2004 - HOSHAEM  

Hongsheng 1206 Side Emitting LED Beads Blue White Yellow Red Green Purple Orange LED Light-emitting Diode Customization SMD Factory 1
Hongsheng 1206 Side Emitting LED Beads Blue White Yellow Red Green Purple Orange LED Light-emitting Diode Customization SMD Factory 2
Hongsheng 1206 Side Emitting LED Beads Blue White Yellow Red Green Purple Orange LED Light-emitting Diode Customization SMD Factory 3
Hongsheng 1206 Side Emitting LED Beads Blue White Yellow Red Green Purple Orange LED Light-emitting Diode Customization SMD Factory 1
Hongsheng 1206 Side Emitting LED Beads Blue White Yellow Red Green Purple Orange LED Light-emitting Diode Customization SMD Factory 2
Hongsheng 1206 Side Emitting LED Beads Blue White Yellow Red Green Purple Orange LED Light-emitting Diode Customization SMD Factory 3

Hongsheng 1206 Side Emitting LED Beads Blue White Yellow Red Green Purple Orange LED Light-emitting Diode Customization SMD Factory

Brand: Hongsheng HOSHAEM 1206 Side Emitting SMD

Size: 3.2 * 1.0 * 1.5mm

Color: Red, yellow, orange, green, blue, purple, white and other colors, support customization

Wavelength: 390-630nm

Brightness: 10-2000mcd

Voltage: 1.8-3.0V

Current: 5mA

Luminous angle: 120 °

Packaging: 3000 pieces/reel

    oops...!

    no product data.

    Go to homepage

    Matters Needing Attention:

    A、 When SMD LEDs are exposed to high temperatures, be careful not to press their adhesive parts.

    B、 Be careful not to use hard objects or objects with sharp edges to scrape or rub the adhesive part of SMD LED.

    C、 Repeat the previous dehumidification action before the next use. Bulk LEDs used for manual operations must be dehumidified before use.

     

    Store

    1. It is recommended to store the product under the following conditions:

    Relative humidity: 60% (maximum)

    Temperature: 5 ℃~30 ℃ (41 ℉~86 ℉)

    2. Shelf life in the packaging bag: 12 months under conditions of<5 ℃~30 ℃ and<30% R.H (relative temperature),

    After opening the packaging, the product needs to be used within one week

     

    Bake

    It is recommended to inspect the product 12 hours after opening the packaging before welding

    Bake under the following conditions:

    1. Surface mount products: 70 ± 3 ℃ (24 hours),

    2. Bulk products: 100 ± 3 ℃ (1 hour).

    详情图1 (32)
    详情图1 (32)
    详情图2 (33)
    详情图2 (33)
    详情图3 (31)
    详情图3 (31)
    详情图4 (31)
    详情图4 (31)
    详情图5 (31)
    详情图5 (31)
    详情图3 (30)
    详情图3 (30)
    详情图5 (30)
    详情图5 (30)
    1 (37)
    1 (37)
    1 (38)
    1 (38)
    1 (39)
    1 (39)
    1 (40)
    1 (40)
    1 (41)
    1 (41)
    生产流程图
    生产流程图
    Recommended For You
    no data
    Feel free to
    contact with us
    If you have any questions about our products or services, feel free to reach out to customer service team.
    Related Products
    no data
    Ready to work with us ?

    Shenzhen Hongsheng Optoelectronics Co., Ltd.

    CONTACT US
    Copyright © 2024 Shenzhen Hongsheng Optoelectronics Co., Ltd - www.hongsheng-led.com | Sitemap
    Customer service
    detect